geoa
Telangana Allows Green Open Access for Consumers with 100 kW Load
Consumers with a contracted or sanctioned load of 100 kW and above, including those combining multiple connections to reach 100 kW within the same electricity division...
1
...
1
Consumers with a contracted or sanctioned load of 100 kW and above, including those combining multiple connections to reach 100 kW within the same electricity division...
1
...
1