
Goa Issues Empanelment Tender for 80 MW of Residential Rooftop Solar Systems
The Goa Energy Development Agency (GEDA) has issued an expression of interest (EoI) for empanelment of agencies to design, supply, install, test, and commission grid-connected rooftop solar photovoltaic (PV) systems ...

Goa Energy Development Agency Invites Bids for Setting up a Biomass Briquetting Project
The Goa Energy Development Agency (GEDA) has invited bids to set up a 2,000 kg/HR biomass briquetting project at Saligao, Bardez in Goa. A briquette is a compressed block of any biomass ...

Goa Invites Bids for Solar Home Systems Under Remote Village Electrification Program
The Goa Energy Development Agency (GEDA) has invited bids for installing solar home lighting systems at various households in the state. The solar systems will be installed under the remote ...

Gujarat Seeks Manufacturers for 5,000 E-Rickshaws and 10,000 Electric Two-Wheelers
The Gujarat Energy Development Agency (GEDA) has invited bids for manufacturers to market and distribute 5,000 battery-operated three-wheelers with lithium-ion batteries in the state. The tender has been floated under ...

Gujarat to Empanel Contractors for Biogas Projects
The Gujarat Energy Development Agency (GEDA) has floated an empanelment tender for large-sized biogas projects in the state. The contract will also include the running and maintenance of the project ...

Tender Announced for 12 MW of Rooftop Solar Systems on Government Buildings in Gujarat
The Gujarat Energy Development Agency (GEDA) has issued a tender for 12 MW of grid-connected rooftop solar systems on government buildings in the state. The rooftop systems will range from ...

Goa to Empanel Installers for 5 MW of Residential Rooftop Solar Systems
Goa Energy Development Agency (GEDA) has issued an expression of interest (EoI) to empanel Installers to design and install 5 MW of grid-connected solar rooftop power projects under CAPEX (capital ...

Gujarat Seeks EV Manufacturers to Market and Distribute Battery-Operated Vehicles
The Gujarat Energy Development Agency (GEDA) has invited expressions of interest (EoI) for manufacturers to market and distribute electric two-wheelers and three-wheelers in the state. The EoI has been issued ...

Gujarat: Bidding Deadline for 600 MW of Residential Rooftop Solar Projects Extended
The Energy and Petrochemical Department, under the Gujarat government, has extended the deadline for receiving applications from empaneled agencies for setting up 600 MW of grid-connected residential rooftop solar projects ...

Gujarat Announces Subsidy on Battery-Operated Vehicles for Students
To promote eco-friendly vehicles, the government of Gujarat has implemented a program for the distribution of battery-operated vehicles (BOVs), especially two-wheelers to the students of grade nine and above. Those ...

KPI Global Expands its Solar Power Project in Gujarat by 7.5 MW
KPI Global Infrastructure Limited has announced that it has added 7.5 MW to its existing solar power project located in Amod taluka of Gujarat’s Bharuch district. As per a filing ...

Gujarat Seeks EV Manufacturers for Marketing and Distribution Authorization
The Gujarat Energy Development Agency (GEDA) has invited expression of interest (EoI) from reputed manufacturers for their authorization to market and distribute battery operated two and three-wheelers. The EoIs have ...

Small Solar Prosumers in Goa Will Now Get 50% Subsidy
The Goa government has approved the amendments in the Goa State Solar Policy – 2017. The policy aims to provide subsidy of up to 50 percent for small prosumers in ...

O&M Tender Issued for a 5 MW Solar Project in Gujarat Solar Park
The Gujarat Power Corporation Limited (GPCL) has issued a tender for the operations and maintenance of a 5 MW solar PV power project at Gujarat Solar Park, located in Charanka ...

Goa to Launch Single Window Portal for Seamless Installation of Rooftop Solar Projects
The Goa Energy Development Agency (GEDA) has prepared a user manual for an online single window clearance portal that would facilitate the seamless implementation of rooftop solar projects in the ...

NTPC Invites Bids for Battery Charging Station for 50 E-rickshaws in Faridabad
The National Thermal Power Corporation (NTPC) has invited bids for setting up battery charging and swapping station for 50 e-rickshaws in Faridabad, Haryana, on pilot project basis. The scope of ...

Gujarat Invites EoI for Marketing and Distribution of E-Rickshaws
The Gujarat Energy Development Agency (GEDA) has invited Expression of Interest (EoI) for the authorization of manufacturers for marketing and distribution of battery operated three wheelers (E-Rickshaws) under the state’s ...

Gujarat Announces Solar-Wind Hybrid Power Policy
The Gujarat government has announced a new solar plus wind hybrid power policy in a bid to promote the simultaneous production of wind and solar power in the state. Under ...

GEDA Tenders 125 MW of Rooftop Solar PV Projects to be Installed Across Gujarat
The Gujarat Energy Development Agency (GEDA) has tendered 125 MW of rooftop solar photovoltaic (PV) projects to be developed across the state. The bid-submission deadline is June 18, 2018. This ...

Gujarat to Develop India’s Largest 5 GW Solar Park
Gujarat will soon have the largest solar park at a single location in India as the state government has approved the establishment of a 5,000 MW in Dholera Special Investment ...

Gujarat Provides Subsidy to 2,000 Consumers for Purchasing Two-Wheeler EVs
Around 2,000 people have been provided subsidies for the purchase of two-wheeler Electric Vehicles (EVs) in the state of Gujarat. Each beneficiary has been provided a subsidy of 10,000 (~$156) ...

New Goa Solar Policy Targets 150 MW of Solar by 2021
The government and cabinet of ministers of Goa have approved the state’s Draft Solar Policy 2017, which sets a target of achieving 150 MW of solar by 2021. The policy ...

India Renewable Energy Policy Roundup: July 2017
Mercom’s renewable energy policy roundup from central, state and government agencies in India for the month of July 2017: Gujarat Electricity Regulatory Commission (GERC) released the GERC Net-Metering Rooftop Solar ...

Goa Energy Development Agency Releases Draft Solar Policy 2017
The Goa Energy Development Agency (GEDA) released Draft Solar Policy 2017. The draft is open for comments up to July 14, 2017. The agency stated, “Goa being eco-sensitive, no thermal ...