DCR Tender SECI Coal India

After Lull, DCR Tendering Begins in India

After a long lull, DCR tendering activity has picked up in India’s solar sector. The Solar Energy Corporation of India (SECI) tendered a 200 MW solar project under domestic content ...
/ / Solar, Tenders & Auctions
Solar Under DCR Category

NTPC Tenders 241 MW of Solar Under DCR Category

The National Thermal Power Corporation (NTPC) has tendered another 241 MW of solar in three separate projects under the domestic content requirement (DCR) category to be developed across the states ...
India MNRE Solar DCR

MNRE Proposes Allocating 7.5 GW of Solar Under CPSU Phase-II Program to Support Domestic Solar Manufacturing

The Ministry of New & Renewable Energy (MNRE) has proposed 7.5 GW of solar to be developed using domestically manufactured solar cells and modules during the second phase of its ...
/ / Solar, Utility Scale
Solar Anti Dumping

China to Cooperate With India to Resolve Solar Anti-Dumping Issue

China wants an amicable resolution to the solar anti-dumping issue with India at the same time raising concerns that the levy of a duty might hinder the growth of the ...
Solar Installations in India to Double

Breaking: Entire 1 GW Kurnool Solar Park to be Grid-Synchronized Tomorrow

The 1 GW Kurnool Solar Park in Andhra Pradesh will be commissioned on July 13, 2017. With the commissioning of Adani’s awarded capacity of 50 MW, the entire proposed 1 ...
/ / Solar, Utility Scale
shipping container

Mercom Exclusive: Anti-Dumping Petition from Indian Solar Manufacturers Comes at a Crucial Time as Solar Becomes Cheaper than Coal

The Indian Solar Manufacturers Association (ISMA) filed a new anti-dumping petition against solar imports from China, Taiwan, and Malaysia with the Directorate General of Anti-Dumping (DGAD), Ministry of Trade and ...
Solar Park

World’s Largest Solar Park in Kurnool on the Cusp of Completion

The Kurnool Ultra Mega Solar Park of 1,000 MW capacity is on the cusp of completion. The 1 GW Kurnool Ultra Mega Solar park will replace the 648 MW Kamuthi ...
/ / Solar, Utility Scale
modules

BREAKING NEWS: Indian Solar Manufacturers File Anti-Dumping Petition

Indian solar manufacturers have filed an anti-dumping petition with the Ministry of Trade and Commerce, against Chinese solar modules and cells hoping that an interim duty will be levied, according ...
/ / Manufacturing, Solar
50 MW Solar Project Tendered for Salem Steel Plant in Tamil Nadu

50 MW Solar Project Tendered for Salem Steel Plant in Tamil Nadu

NTPC-SAIL Power Company Limited (NSPCL), a joint venture between the National Thermal Power Corporation (NTPC) and Steel Authority of India Limited (SAIL), has tendered a 50 MW solar PV project ...
Domestic Solar Manufacturers

NTPC May Procure Domestic Solar Power Components for Captive Consumption Solar Projects

The National Thermal Power Corporation (NTPC) is planning to meet its entire auxiliary power requirement through domestically manufactured solar equipment. Auxiliary power is used by NTPC to run its thermal ...
/ / Modules, Solar
Maharashtra Seamless Commissions 20 MW DCR Solar Project in Rajasthan

Maharashtra Seamless Commissions 20 MW DCR Solar Project in Rajasthan

Maharashtra Seamless, a manufacturer of electric resistance welded and seamless pipes and tubes, announced that it has commissioned a 20 MW solar project in Khetusar village, Jodhpur, Rajasthan. The company announced that ...
/ / Solar, Utility Scale
Month in a Minute

Month in a Minute: Important Headlines and Data Points from the Indian Renewable Sector in April 2017

Mercom India forecasts cumulative installations in the calendar year 2017 to reach 10 GW. The European Investment Bank (EIB) approved a EUR 200 million (~Rs.13.8 billion), 20-year loan to State Bank of ...
CEL Northern Railways

Central Electronics Limited Tenders 3.22 MW of Rooftop Solar for Northern Railways

Central Electronics Limited (CEL) tendered 3.22 MW of grid-connected rooftop solar to be installed at railway workshops under Northern Railway across Indian states. The bid-submission deadline is May 26, 2017 ...
modules

Mercom Exclusive: Domestic Content Requirement Tenders are all but Disappearing

The domestic content requirement (DCR) category, the mandate for solar projects in India to utilize domestically manufactured solar modules and cells, was instituted in the Jawaharlal Nehru National Solar Mission ...
Month in a Minute

Month in a Minute: Important Headlines and Data Points from the Indian Renewable Energy Sector in March 2017

The Asian Development Bank approved a $175 million (~Rs.11.35 billion) loan to the Power Grid Corporation (PGCIL) to expand its solar power transmission network across the country. Payment delays by ...
/ / Other, Renewable Energy
Tenders and Auctions

Mercom Exclusive: Solar Tenders and Auctions Have Slowed in India

While solar installations in India have picked up speed, tender and auction activity has been slowing down over the last couple of quarters. According to Mercom's India Solar Project Tracker, ...
Bids

1,000 MW of Solar Retendered, 4.5 MW Tendered and 47.5 MW Auctioned in India, in March 2017

In the month of March, there were 1,000 MW of solar retendered, 4.5 MW newly tendered projects and 47.5 MW of solar that went to auction. Compared to February, when ...
NTPC Retenders 750 MW of Solar at Pavagada Solar Park in Karnataka

NTPC Retenders 750 MW of Solar at Pavagada Solar Park in Karnataka

The National Thermal Power Corporation (NTPC) has retendered 750 MW of solar at the Pavagada Solar Park in Karnataka. This is an Open category tender and the bid-submission deadline is ...
Solar Park

SECI Cancels 150 MW Bhadla Solar Park Tender Under Domestic Content Category

The Solar Energy Corporation of India (SECI) has cancelled the projects tendered under the domestic content requirement (DCR) category in Bhadla Solar Park, Rajasthan; these projects fell under the National ...
1 MW Solar

Numaligarh Refinery Tenders 1 MW Solar Project in Assam

Numaligarh Refinery, a group company of Bharat Petroleum Corporation, has tendered a 1 MW solar project to be developed at the Numaligarh Refinery facility located in Golaghat, Assam. The bid-submission ...
Solar Panel

Mercom Exclusive: Can Domestic Manufacturers Capture a Larger Piece of the Growing Indian Solar Market?

Solar installations in India reached 4 GW in 2016, and are expected to surpass 9 GW in 2017, an incredible pace of growth considering India installed just 883 MW in ...
Solar Project

SECI Tenders a 50 MW Solar Project under DCR Category at Bhadla Phase-IV Solar Park in Rajasthan

The Solar Energy Corporation of India (SECI) has tendered 50 MW of solar under the domestic content requirement (DCR) category at Bhadla Phase-IV Solar Park in Rajasthan. The project will be developed ...
Month in a Minute: Important Headlines and Data Points from the Indian Renewable Sector in December 2016

Month in a Minute: Important Headlines and Data Points from the Indian Renewable Sector in December 2016

Under Deen Dayal Upadhyay Gram Jyoti Yojana (DDUGJY), the Solar Energy Corporation of India (SECI) issued tenders for electrification of 1,058 villages in Arunachal Pradesh. (read more) The Central Electricity Authority stated ...
/ / Markets & Policy, Solar
NLC India

Neyveli Lignite Corporation India Tenders 500 MW Solar in Tamil Nadu

The Neyveli Lignite Corporation (NLC) has tendered 500 MW (AC) of grid-connected solar in the state of Tamil Nadu. The state-owned company has mandated that each project will be a ...
/ / Solar, Utility Scale
Utility Scale Solar

Azure Power Begins Construction of 100 MW Solar Project at Kurnool Ultra Mega Solar Park

Azure Power has commenced the construction of a 100 MW solar project at the Kurnool Ultra Mega Solar Park in Andhra Pradesh. The project is expected to be commissioned by ...
/ / Solar, Utility Scale