pumped-storage-projects
India added 3.6 GW of solar open access capacity in the first half (1H) of 2024, a 153% increase from the 1.4 GW installed during the same period in 2023, according to...
Tamil Nadu has issued the Pumped Storage Projects (PSP) Policy 2024 to harness the potential of PSPs to optimize renewable energy utilization, promote sustainable energy...
The Ministry of Coal has identified 20 abandoned mines to evaluate their feasibility for setting up pumped storage projects and leveraging vast land banks’...
The Ministry of Power has proposed that pumped storage projects be supported through concessional climate finance. Sovereign green bonds issued for mobilizing resources...
The New and Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) has floated a tender for reports on techno-commercial feasibility of pumped...
1
...
1