MNRE Lowers Benchmark Costs of Rooftop Solar Projects for FY 2022

MNRE Lowers Benchmark Costs of Rooftop Solar Projects for FY 2022

The Ministry of New and Renewable Energy (MNRE) has reduced the benchmark costs, excluding the Goods and Services Tax (GST), for grid-connected rooftop solar photovoltaic (PV) projects for the financial ...
/ / Markets & Policy, Solar
MNRE Brings Down Benchmark Costs for Off-grid Solar Systems for FY 2021-22

MNRE Brings Down Benchmark Costs for Off-grid Solar Systems for FY 2021-22

The Ministry of New and Renewable Energy (MNRE) has issued a downward revision of benchmark costs excluding taxes for decentralized and off-grid solar systems for the financial year (FY) 2021-22 ...
/ / Off-grid, Solar
Tender Reissued for 10 MW of Residential Rooftop Solar Systems with Net Metering

Tender Reissued for 10 MW of Residential Rooftop Solar Systems with Net Metering

The Gulbarga Electricity Supply Company Limited (GESCOM) has reissued the tender to empanel agencies to design, supply, install, and commission 10 MW of grid-connected rooftop solar projects under net metering ...
/ / Solar, Tenders & Auctions
MNRE Hikes Benchmark Costs for Rooftop Solar Projects in FY 2022 (1)

MNRE Announces New Benchmark Costs for Off-Grid Solar Systems for FY 2022

The Ministry of New and Renewable Energy (MNRE) has notified new benchmark costs for off-grid solar photovoltaic (PV) systems and decentralized solar PV systems for the financial year (FY) 2021-22. The new ...
/ / Off-grid, Solar
Benchmark Costs for Grid Connected Rooftop Solar Power Projects for the Year 2021-22

MNRE Hikes Benchmark Costs for Rooftop Solar Projects in FY 2022

The Ministry of New and Renewable Energy (MNRE) has issued benchmark costs for grid-connected rooftop solar photovoltaic (PV) systems for the financial year (FY) 2021-22. The benchmark cost for FY ...
/ / Rooftop, Solar
Generic Tariff of Solar PV Projects Proposed to be Reduced to ₹4.04kWh in Uttarakhand

Generic Tariff of Solar PV Projects Proposed to be Reduced to ₹4.04/kWh in Uttarakhand

The Uttarakhand Electricity Regulatory Commission (UERC) has issued a draft proposal to review the benchmark capital cost and generic tariff for solar photovoltaic (PV), solar thermal, and grid-interactive rooftop solar ...
/ / Markets & Policy, Solar
Aggressive Bids Adversely Affecting the Sector - Rooftop Solar Integrators to MNRE

Aggressive Bids Adversely Affecting the Sector – Rooftop Solar Integrators to MNRE

Solar Parivar, an Uttar Pradesh-based group connected with the solar energy sector, has requested the Ministry of New and Renewable Energy (MNRE) to resolve issues faced by rooftop solar integrators ...
/ / Markets & Policy, Solar
MNRE Issues New Benchmark Costs for Rooftop Solar Projects in FY 2021

MNRE Issues New Benchmark Costs for Rooftop Solar Projects in FY 2021

The Ministry of New and Renewable Energy (MNRE) has published benchmark costs for grid-connected rooftop solar projects for the financial year (FY) 2020-21. The benchmark costs will be applicable for ...
/ / Rooftop, Solar
New Benchmark Costs Announced for Off-Grid Solar Systems

New Benchmark Costs Announced for Off-Grid Solar Systems

The Ministry of New and Renewable Energy (MNRE) has notified new benchmark costs for off-grid solar photovoltaic (PV) systems and solarization of grid-connected agricultural pumps for the financial year (FY) ...
/ / Off-grid, Solar
MNRE Issues New Rooftop Solar Benchmark Costs for 2019-20

MNRE Issues New Rooftop Solar Benchmark Costs for 2019-20

The Ministry of New and Renewable Energy (MNRE) has notified the new benchmark costs for grid-connected rooftop solar power projects for the financial year (FY) 2019-20. The new benchmark costs ...