SECI’s 1.8 GW Wind Tender Left Undersubscribed with Bids for Only 551 MW

SECI’s 1.8 GW Wind Tender Left Undersubscribed with Bids for Only 551 MW

The Solar Energy Corporation of India (SECI)’s tender to set up 1,800 MW of inter-state transmission system (ISTS)-connected wind power projects under tranche VIII has been undersubscribed by 1,249 MW ...
/ / Other, Wind
Another SECI Tender Left Undersubscribed: 1.2 GW Capacity Receives Bids for Only 600 MW

Another SECI Solar Tender Left Undersubscribed: 1.2 GW Capacity Receives Bids for Only 600 MW

The Solar Energy Corporation of India (SECI)’s tender for setting up 1.2 GW of solar photovoltaic (SPV) projects under interstate transmission system V (ISTS-V) has been undersubscribed by 50%, receiving ...
SECI Invites EoIs to Develop 160 MW Solar Wind Hybrid Project with Energy Storage

SECI’s 1.2 GW ISTS-Connected Wind-Solar Hybrid Tender Undersubscribed by 150 MW

The 1.2 GW ISTS-connected wind-solar hybrid power projects (tranche-I) tender which was floated by the Solar Energy Corporation of India (SECI)’s has been undersubscribed by 150 MW. “The ceiling tariff ...
/ / Solar, Tenders & Auctions
: Wind, Reverse Auctions, PPA, SECI, ISTS

SECI’s 2 GW Wind Tender Receives Damp Response, Undersubscribed by 800 MW

The Solar Energy Corporation of India (SECI)’s 2 GW Tranche-V wind tender has been undersubscribed by 800 MW. The shortage of connectivity infrastructure across the country seems to have taken ...
/ / Other, Wind