ADB Approves ₹13.9 Billion Loan to Upgrade Bengaluru's Power Distribution System

ADB Approves ₹13.9 Billion Loan to Upgrade Bengaluru’s Power Distribution System

In a significant development, the Asian Development Bank (ADB) has approved a loan of $190 million (~₹13.9 billion) to upgrade the existing power distribution system in the city of Bengaluru ...
/ / Finance and M&A, Other
Tata Power Takes Charge of Power Distribution in Odisha

Tata Power Takes Charge of Power Distribution in Odisha

Tata Power has announced that it has taken over the management of Central Electricity Supply Utility of Odisha (CESU) for the distribution and supply of power in Odisha’s five circles ...
/ / Grid, T&D
Lockdown Until May 3rd, But Renewable Projects Construction to Resume from April 20th

Lockdown Until May 3rd, But Renewable Projects Construction to Resume from April 20th

As the country enters the extended lockdown period to arrest the novel Coronavirus (COVID-19) outbreak, the Ministry of Home Affairs (MHA) has issued its revised guidelines allowing selected additional activities ...
/ / Other, Renewable Energy