Azure Power and Tata Power Top the Rooftop Solar Installer Leaderboard in 1H 2019

Azure Power and Tata Power Top the Rooftop Solar Installer Leaderboard in 1H 2019

Approximately  3.8 GW of rooftop solar projects have been installed cumulatively across India as of the end of first half (1H) of 2019. During 1H 2019, approximately 555 MW of ...
/ / Mercom Research Focus, Other
Azure Power and ReNew Power Were the Top Utility-Scale Solar Developers During 1H 2019

Azure Power and ReNew Power Were the Top Utility-Scale Solar Developers During 1H 2019

In the first half of this year (1H 2019), Azure Power, ReNew Power, Sprng Energy, and Tata Power emerged as the top four developers of utility-scale solar power projects in ...
/ / Mercom Research Focus, Other