India Needs 38 GW of 4-Hour Battery Storage to Integrate 450 GW of Renewables by 2030: Study

India Needs 38 GW of 4-Hour Battery Storage to Integrate 450 GW of Renewables by 2030: Study

In a joint study, Finnish power conglomerate Wartsila and consulting firm KPMG have said that supply-side flexibility is needed at the pan-India level to integrate 450 GW of renewables by 2030 efficiently ...
Investment of ₹52.81 Billion for an 850 MW Hydropower Project in Jammu & Kashmir Approved

Investment of ₹52.81 Billion for an 850 MW Hydropower Project in Jammu & Kashmir Approved

The Union Cabinet has approved an investment of ₹52.81 billion (~$723.43 million) for the 850 MW Ratle Hydropower project, located on the Chenab river in the Kisthwar district of Jammu ...
/ / Other, Renewable Energy