Centre Allows Intrastate Connectivity for ISTS Renewable Energy Projects
The move aims to optimize transmission costs for renewable energy projects supplying power within the same state
November 11, 2026
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Ministry of Power has permitted renewable energy projects tendered on an interstate transmission system (ISTS) connectivity basis to connect to the intrastate transmission system (InSTS) when the generating project and the electricity procurer are located within the same state.
