thumbnail
Patel Infrastructure, Alfanar, KP Energy, Powerica Win GUVNL’s 250 MW Wind Auction

Patel Infrastructure, Alfanar Power, KP Energy, and Powerica won Gujarat Urja Vikas Nigam’s (GUVNL) auction to set up 250 MW grid-connected wind power projects (Phase X). Patel and Alfanar quoted a tariff of ₹3.43 (~$0.0382) to wi...

December 31, 2025

Mercom Research Focus

Rooftop Solar Gets Cheaper as GST Cut Shortens Payback Period for Consumers

With the government reducing the Goods and Services Tax (GST) on several rooftop solar system components, installation costs under the PM Surya Ghar: Muft Bijli Yojana have declined by up to 10%, according to industry sources. In ...

December 30, 2025

C&I

Open Access Renewables Gain Ground Among Maharashtra’s Industries

Maharashtra is steadily cementing its position as one of India’s important markets for green energy procurement through the open access route. The state ranks second in installed open-access solar capacity, accounting for over 17%...

December 31, 2025

Mercom Research Focus

Mercom India’s Most Read News Stories from 2025

Here is a collection of the most-read news stories and in-depth articles of 2025. Many of the top stories this year related to policy moves that influenced rooftop solar markets, trade actions reshaping solar manufacturing economi...

December 30, 2025

Latest News

thumbnail
Grid India Proposes Grid-Forming Capability for 50 MW+ BESS Installations

A Grid Controller of India (Grid-India) discussion paper has proposed that all new battery energy storage system (BESS) installations of 50 MW and above should incorporate grid-forming capability, especially when located in weak grid or remote areas....

January 2, 2026

thumbnail
Maharashtra Regulator Clears MSEDCL’s 700 MW Solar Procurement

The Maharashtra Electricity Regulatory Commission (MERC) has approved the proposal of the Maharashtra State Electricity Distribution Company (MSEDCL) to procure 700 MW of solar power through the Solar Energy Corporation of India (SECI) under the...

January 2, 2026

thumbnail
NTPC REL Floats EPC Tender for 250 MW Solar Project with 200 MWh BESS

NTPC Renewable Energy (NTPC REL) has invited bids for the engineering, procurement, and construction (EPC) of a 250 MW solar project with a 50 MW/200 MWh battery energy storage system (BESS) in Sitapur, Uttar Pradesh. The last date to submit bids is...

January 2, 2026

thumbnail
DRDO Invites EoI for 5 MW Solar Project with BESS in Odisha

The Proof & Experimental Establishment (PXE), a unit of the Defence Research and Development Organization (DRDO), has issued an expression of interest for the development and installation of a 5 MW grid-connected solar project with a battery...

January 2, 2026

thumbnail
Daily News Wrap-Up: GUVNL Announces Winners of 250 MW Wind Auction

Patel Infrastructure, Alfanar Power, KP Energy, and Powerica won Gujarat Urja Vikas Nigam’s (GUVNL) auction to set up 250 MW grid-connected wind power projects (Phase X). Patel and Alfanar quoted a tariff of ₹3.43 (~$0.0382) to win 100 MW and 50 MW,...

January 2, 2026

thumbnail
Sodium-Ion Batteries Show Faster Charging Than Lithium-Ion in New Study

Sodium-ion batteries could charge faster than lithium-ion batteries, according to an experimental study led by the Department of Applied Chemistry at Tokyo University of Science that directly compares the motion and reactions of sodium and lithium...

January 2, 2026

thumbnail
China’s Market Regulator Steps in to Stabilize Solar Pricing

China’s State Administration for Market Regulation (SAMR) issued compliance guidance in Hefei, Anhui Province, to regulate the order of price competition in the solar photovoltaic (PV) industry. SAMR briefed participants on price-related violations...

January 2, 2026

thumbnail
MNRE Amends PM Surya Ghar Service Charge Rules

The Ministry of New and Renewable Energy (MNRE) has amended guidelines for disbursing service charges under the PM Surya Ghar program, introducing operational clarifications for state and model solar village implementation agencies, while retaining...

December 31, 2025

thumbnail
Waaree Wins EPC Contract for 29 MW Solar Project

Waaree Renewable Technologies, the engineering, procurement, and construction (EPC) arm of the Waaree Group, has secured a letter of award from an undisclosed Indian customer for the EPC of a 28.6 MW ground-mounted solar project on a turnkey basis....

December 31, 2025

MORE NEWS