Gujarat Floats Tender for 700 MW of Grid-Connected Solar Projects

Bid Submission Deadline for 750 MW Solar Tender in Rajasthan Extended by SECI

The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for 750 MW of grid-connected solar photovoltaic (PV) projects to be developed on a standalone basis across the state ...
/ / Solar, Tenders & Auctions
Andhra Pradesh Announces Tender for 10 MW of Solar-Wind Hybrid Projects

Bid-Submission Deadline for 1,200 MW Solar-Wind Hybrid Tender Extended for the 5th Time

The Solar Energy Corporation of India (SECI) has extended the bid-submission deadline for 1,200 MW of interstate transmission system (ISTS)-connected wind and solar hybrid projects tender for the fifth time ...
/ / Solar, Tenders & Auctions
SECI Invites EoIs to Develop 160 MW Solar Wind Hybrid Project with Energy Storage

SECI’s ISTS-Connected Wind-Solar Hybrid Projects’ RfS Reduced to 1,200 MW from 2,500 MW

The Solar Energy Corporation of India (SECI) has amended the RfS for 2,500 MW of ISTS-connected wind-solar hybrid power projects (tranche-I). According to the amendment, the capacity of ISTS-connected wind-solar ...
/ / Markets & Policy, Solar
Budgetary Allocation for Solar Increased by 1% While Coal Gets a 48% Boost in 2019-20

Why the 2.4 GW Solar Auction Was Cancelled

A few weeks ago, news that the Solar Energy Corporation of India (SECI) cancelled 2.4 GW of auctioned solar capacity made the headlines. The capacity cancelled was part of the ...
SECI’s Mega Solar Manufacturing Tender Gets Third Extension for Bid Submission

SECI’s Mega Solar Manufacturing Tender Gets Third Extension for Bid Submission

The Solar Energy Corporation of India (SECI) has once again extended the bid submission deadline for setting up of 10 GW of ISTS connected solar PV power projects linked with 3 GW ...
/ / Solar, Tenders & Auctions
Sembcorp Commissions 250 MW of ISTS-Connected Wind Projects in Tamil Nadu

Sembcorp Commissions 250 MW of ISTS-Connected Wind Projects in Tamil Nadu

Sembcorp has commissioned 250 MW of interstate transmission system (ISTS)-connected wind power projects. The capacity is part of the 1,000 MW of wind projects tendered by the Solar Energy Corporation ...
/ / Other, Wind
CERC Proposes Granting Category I Inter-State Trading License to Refex Energy

CERC Issues Regulations for Seamless Implementation of ISTS Across the Country

The Central Electricity Regulatory Commission (CERC) has published regulations for ISTS (Inter-State Transmission System) implementation in the official gazette. These regulations have been in force since July 23, 2018. The ...
/ / Grid, Grid Optimization
SECI Extends Bid Submission Deadline for 10 GW Solar Tender with 3 GW Manufacturing

SECI Extends Bid Submission Deadline for 10 GW Solar Tender with 3 GW Manufacturing

The Solar Energy Corporation of India (SECI)  has extended the bid submission deadline for the setting up of 10 GW of  ISTS connected solar PV power projects linked with 3 GW ...
/ / Markets & Policy, Solar
SECI Extends Bid Submission Deadline for 150 MW of Floating Solar Project Tender

SECI Extends Bid Submission Deadline for 150 MW of Floating Solar Project Tender

The Solar Energy Corporation of India (SECI)  has extended the bid submission deadline for setting up 150 MW (50 MW x 3) of grid connected floating solar power projects at ...
/ / Floating Solar, Solar
SECI Reduces Solar Manufacturing Tender Size From 5 GW to 3 GW

SECI Reduces Solar Manufacturing Tender Size From 5 GW to 3 GW

In a significant development, the Solar Energy Corporation of India (SECI) has announced that it has reduced the capacity of the manufacturing tender which was introduced by the body a ...
/ / Solar, Tenders & Auctions
: Wind, Reverse Auctions, PPA, SECI, ISTS

India Sees Commissioning of the First Batch of ISTS-Connected Wind Projects

The first batch of auctioned interstate transmission system (ISTS)-connected wind energy projects have been commissioned in India. These projects were tendered by the Solar Energy Corporation of India (SECI) in ...
/ / Other, Wind
SECI Tenders 2 GW of ISTS-Connected Wind Projects under Tranche-V

Sprng Energy Quotes Lowest Tariff of ₹2.77/kWh in NTPC’s 1.2 GW Wind Auction

The National Thermal Power Corporation (NTPC) has auctioned 1.2 GW of interstate transmission system (ISTS)-connected wind power projects to be developed across India. In the auction, Sprng Vayu Vidyut Private ...
/ / Other, Wind
Lowest Tariff of ₹2.59/kWh Wins NTPC's 2 GW Solar Auction

Lowest Tariff of ₹2.59/kWh Wins NTPC’s 2 GW Solar Auction

Lowest (L1) tariff of ₹2.59 (~$0.0372)/kWh was quoted in the auction held by the National Thermal Power Corporation (NTPC) to develop 2 GW of interstate transmission system (ISTS)-connected solar photovoltaic ...
/ / Solar, Tenders & Auctions
NTPC Asks Bidders to Revise and Resubmit Bids for 2 GW Solar Tender Due to Safeguard Duty

NTPC Asks Bidders to Revise and Resubmit Bids for 2 GW Solar Tender Due to Safeguard Duty

The sudden imposition of the safeguard duty on solar cell and module imports from China and Malaysia has caught the domestic project developers off-guard. However, in a positive development for ...
/ / Markets & Policy, Solar
SECI Cancels 2 GW ISTS-Connected Wind Tender, Retenders 1.2 GW

SECI Cancels 2 GW ISTS-Connected Wind Tender, Retenders 1.2 GW

The Solar Energy Corporation of India (SECI) has cancelled the undersubscribed 2 GW Tranche-V interstate transmission system (ISTS)-connected wind tender. SECI had tendered the capacity in May 2018. Technical bids totaling ...
Will the SECI 3 GW Solar Auction Be Cancelled?

Cancelling 3 GW SECI Solar Auction Could Backfire Due to Safeguard Duty

The Solar Energy Corporation of India (SECI)’s 3 GW Interstate Transmission System (ISTS)-connected solar auction stands a chance of being cancelled according to government sources and developers. In the auction, ...
Suzlon Registers ₹5.75 Billion Net Loss in First Quarter of FY19

KP Energy and GE India Sign Agreement for a 300 MW Wind Project in Gujarat

KP Energy and GE India Industrial (P) Limited have signed a definitive agreement for the development of a 300 MW wind power project, consisting of 120 wind turbine generators of ...
/ / Other, Wind
Tariffs in India Stabilize at Record Low of ₹2.44/kWh in SECI’s 3 GW Solar Auction

Solar Tariffs in India Remain Steady at ₹2.44/kWh in SECI’s 3 GW Auction

The Solar Energy Corporation of India (SECI) has auctioned 3 GW of Interstate Transmission System (ISTS)-connected solar photovoltaic (PV) in which ACME emerged as the lowest (L1) bidder by quoting ...
Will the Lowest Bid Breach 2.44/kWh in the Upcoming SECI 3 GW Auction?

Will the Lowest Bid Breach ₹2.44/kWh Mark in the Upcoming SECI 3 GW Solar Auction?

Tariffs are expected to tumble to record lows in the upcoming SECI 3 GW Inter-State Transmission System (ISTS)- connected solar auction.  As of June, the tender was oversubscribed by 2.1 ...
NTPC’s 2 GW Solar Tender Oversubscribed by Over Three Times

NTPC’s 2 GW Solar Tender Oversubscribed by Over Three Times

National Thermal Power Corporation (NTPC)’s 2 GW interstate transmission system (ISTS)-connected solar photovoltaic (PV) tender has been oversubscribed by over three times. Bids aggregating 6,200 MW have been submitted in ...
SECI’s 1,200 MW Wind Tender Receives Bids Totaling 2,190 MW

SECI Tenders 2.5 GW of ISTS-Connected Wind Projects Under Tranche-VI

The Solar Energy Corporation of India (SECI) has come up with a new tender for 2.5 GW of ISTS-connected wind power projects to be developed across the country. The bid-submission ...
/ / Other, Wind
SECI Floats Tender for 3 GW of ISTS-Connected Solar PV Projects

SECI Floats Tender for 3 GW of ISTS-Connected Solar PV Projects

The Solar Energy Corporation of India (SECI) has tendered 3 GW of interstate transmission system (ISTS)-connected solar photovoltaic (PV) projects to be developed across the country. The bid-submission deadline is ...
SECI’s 3 GW ISTS-Connected Solar PV Tender Oversubscribed by 2.1 GW

SECI’s 3 GW ISTS-Connected Solar PV Tender Oversubscribed by 2.1 GW

The 3 GW Inter-State Transmission System (ISTS)- connected solar photovoltaic (PV) tender which was floated by the Solar Energy Corporation of India (SECI)’s has been oversubscribed by 2.1 GW. According ...
SECI’s 2 GW ISTS-Connected Solar PV Tender Oversubscribed by 1.8 GW

SECI’s 2 GW ISTS-Connected Solar PV Tender Oversubscribed by 1.8 GW

The Solar Energy Corporation of India (SECI)’s 2 GW inter-state transmission system (ISTS)-connected grid-connected solar photovoltaic (PV) tender has been oversubscribed by 1.8 GW, highlighting the voracious appetite of developers ...
SECI Tenders 2 GW of ISTS-Connected Wind Projects under Tranche-V

SECI Tenders 2 GW of ISTS-Connected Wind Projects Under Tranche-V

After the success of the recently held wind auctions, the Solar Energy Corporation of India (SECI) has now tendered 2 GW of Inter-State Transmission System (ISTS)-connected wind power projects to ...
/ / Other, Wind